New Bridge Near Tompkins Bend Trailhead on 1st Trail Segment – April 2012
From mid to late April, the Traildogs re-routed a bit of the first leg of the trail near the Tompkins Bend trailhead and replaced a bridge that had been washed away and subsequently damaged by a controlled burn. The new bridge was constructed further away from the area that is subject to springtime floods.
Traildog Robert put an album on our Facebook site documenting the work, and those photos are also captured here.
Robert writes: “That was such a good day. Makes me glad to be alive. Jerry, that was amazing work on measuring and cutting the materials off site. I am very impressed with the planning and the execution of it.”
Enjoy the photos and the new bridge!